CDR done, → Preliminary Design
CDR Feedback + Response
First Gen meeting plan
- Introduction
- Onboarding
- Communication (notion, discord, github)
Onboarding Project
- Reverse engineering RC aircraft
- 2 aircraft with 2 teams
- Analyze RC aircraft
- Why chosen airfoil, configuration, etc
- CAD rc aircraft design
- Presentation at the end to us
CDR Feedback
Configuration
- Talk more about sizing
- Figure out control and stability
- Do a tapered wing
- Fuselage needs to be longer
- May do low wing