<aside> 📋
Rules are out https://www.aiaa.org/docs/default-source/uploadedfiles/aiaadbf/resources/dbf-rules-2025---draft.pdf
</aside>
Standard Ops Procedure Outline
plane configuration finalized by end of September
v0 prototype in works starting October
v0 prototype manufacturing by November
v0 prototype testing December
winter break, design refine time,
beginning of January, perform testing
Feb: basic airplane ver 1 built
March: practice runs
Conceptual Design Review | End of September |
---|---|
Preliminary Design Review | End of October |
Critical Design Review | Mid-January |